How we control quality
- Our engineers work with Solidworks and Inventor for our 3D drawing designs.
- 100% inspection before we put all materials and components on our production line.
- CNC machining,UG/MasterCAM MILL 9.1 program for CNC.
- All mini power packs and valves are 100% pressure tested.
- Highest level test benchmarks for valves and power units with flow, pressure, current, and voltage sensor.